| Project name: | Emissions Prevention: Permanent Abandonment of Marginal Oil and Natural Gas Wells in Oklahoma – Project A |
| Hash: | 0xd05042f7bef4f559662927622ce0307c293c28d1 |
| Token ID: | T-CC.EPPA6908 |
| InsCoverage: | Yes |
| RatingProvider: | N/A |
| RatingScore: | |
| Auditor/Verifier: | Carbon Check (India) Private Limited |
| Asset Description: |
This project involves the permanent plugging and abandonment of 10 marginal oil and gas wells located in the Tulsa and Pawnee regions of Oklahoma to prevent methane emissions and reduce long-term environmental and groundwater risks.
|
| Mint Date: | 09/04/2026 17:03:04 |
| Project QTY: | 320,792 |
| OpenQ: | 304,753 |
| Buf / Leak QTY: | 16,039 |
| Unissued QTY: | 16,039 |
| Price: | $35.00 |
| RetiredQ: | 0 |
| Deal Description: |
The project is expected to generate carbon credits through the verified elimination of fugitive methane emissions resulting from permanent well abandonment. Revenue from the sale of these credits in the voluntary carbon market is intended to offset project costs and support the long-term financial sustainability of the project. Primary funding is provided through private investment.
|
| Sustainable Development Goals (SDGs): |
|
| Data Room: |
| Triangle Registry Params | Value |
|---|---|
| Instrument Category |
Carbon Credit...
Carbon Credit
|
| Carbon Credit Type |
Engineered...
Engineered
|
| Instrument Subtype |
Oil and Gas Well Capping...
Oil and Gas Well Capping
|
| Carbon Credit Frequency |
One-time...
One-time
|
| Source Of This Asset |
D-MRV / Methodology...
D-MRV / Methodology
|
| Asset source |
N/A...
N/A
|
| Project Ex-ante or Ex-post |
Ex-post...
Ex-post
|
| Contract Type |
As Produced...
As Produced
|
| Carbon Credit Registry |
Triangle...
Triangle
|
| Protocol / Methodology |
ISO 14064-2 Methodology for Methane Emissions Prevention via Permanent Abandonment of Marginal Oil and Natural Gas Wells...
ISO 14064-2 Methodology for Methane Emissions Prevention via Permanent Abandonment of Marginal Oil and Natural Gas Wells
|
| Tag Name |
Quantification, monitoring, reporting and verification of greenhouse gas emission reductions from the permanent plugging and abandonment of marginal oil and natural gas wells....
Quantification, monitoring, reporting and verification of greenhouse gas emission reductions from the permanent plugging and abandonment of marginal oil and natural gas wells.
|
| Methodology / Protocol # |
TNC-ISO-METH-002...
TNC-ISO-METH-002
|
| Carbon Credit Protocol / Methodology ID |
08FF0EA1E6919572EE7E445D2E0643DC...
08FF0EA1E6919572EE7E445D2E0643DC
|
| Carbon Credit Calculation Parameters Description |
Baseline methane emissions are quantified using direct, well-level methane measurements collected prior to permanent Plugging and Abandonment (P&A). Project emissions are quantified after plugging and...
Baseline methane emissions are quantified using direct, well-level methane measurements collected prior to permanent Plugging and Abandonment (P&A). Project emissions are quantified after plugging and are conservatively assumed to be zero. Leakage is also assumed to be zero.
|
| Carbon Credit Calculation Parameters (Formula) |
ER = BE - PE - L, where BE = Qpp * GWPCH4 * Ncpy * Buf / 1000, Qpp = ME * Nhpy, PE = Qpost * GWPCH4 * Ncpy / 1000...
ER = BE - PE - L, where BE = Qpp * GWPCH4 * Ncpy * Buf / 1000, Qpp = ME * Nhpy, PE = Qpost * GWPCH4 * Ncpy / 1000
|
| Is There Environmental Product Declaration |
None...
None
|
| Asset Registry |
Triangle...
Triangle
|
| Regulated Asset Registry ID |
A50AEDB50D193EF25FE0E923876E0413...
A50AEDB50D193EF25FE0E923876E0413
|
| Buffer Supply % Or QTY |
%...
%
|
| Modified Date |
09/04/2026 17:34:42...
09/04/2026 17:34:42
|
| Asset Name |
Emissions Prevention: Permanent Abandonment of Marginal Oil and Natural Gas Wells in Oklahoma – Project A...
Emissions Prevention: Permanent Abandonment of Marginal Oil and Natural Gas Wells in Oklahoma – Project A
|
| Carbon Credit Campaign Status |
Minted: Roadshow...
Minted: Roadshow
|
| Asset Financed |
Yes...
Yes
|
| Baseline Emissions Measurement Cycle |
Once...
Once
|
| Baseline Emissions Parameters Per Measurement Site |
Methane emission rate (ME) in kg CH4/hour...
Methane emission rate (ME) in kg CH4/hour
|
| Baseline Emissions Formula Per Measurement Site |
Qpp = ME * Nhpy...
Qpp = ME * Nhpy
|
| Number Of Measurement Sites |
10...
10
|
| Total Baseline Emissions For Project (Sum Of All Sites) |
305,507.0000...
305,507.0000
|
| Financing Type |
Equity...
Equity
|
| Financing Description |
Primary funding for the project is provided through private investment committed to supporting methane abatement and environmental remediation activities....
Primary funding for the project is provided through private investment committed to supporting methane abatement and environmental remediation activities.
|
| Financing Collateral. Carbon Credit Part Of Collateral? |
None...
None
|
| Financing Counterparty |
N/A...
N/A
|
| Associated Parameter - Efficiency Of The Project Device |
Measured methane emission rate (ME)...
Measured methane emission rate (ME)
|
| Method Implemented - Kitchen Performance Test (KPT) And Monitoring |
continuous multi-sensor ambient arrays with meteorological inputs and model-based flux inversion, high-flow sampling, tracer correlation, EPA OTM-33A, calibrated continuous mass-flow measurement...
continuous multi-sensor ambient arrays with meteorological inputs and model-based flux inversion, high-flow sampling, tracer correlation, EPA OTM-33A, calibrated continuous mass-flow measurement
|
| Additionality Description |
Additionality is restated as three methodology-defined elements: Element A — Regulatory surplus, Element B — Financial barrier, Element C — Non-common practice....
Additionality is restated as three methodology-defined elements: Element A — Regulatory surplus, Element B — Financial barrier, Element C — Non-common practice.
|
| Permanence Description |
A 50-year permanence horizon is assumed for the physical P&A intervention... The primary evidence for permanence is physical rather than instrumental: engineered cement barriers set across hydrocarbon...
A 50-year permanence horizon is assumed for the physical P&A intervention... The primary evidence for permanence is physical rather than instrumental: engineered cement barriers set across hydrocarbon-bearing intervals, a permanent surface closure, a plugging record attested by the competent authority, and completed site restoration.
|
| Eligibility |
Permanent plugging and abandonment (P&A) of marginal oil and natural gas wells in the United States....
Permanent plugging and abandonment (P&A) of marginal oil and natural gas wells in the United States.
|
| Quantification |
N/A...
N/A
|
| Validation |
This methodology applies only where all applicability conditions in Section 4.1 are satisfied. Each condition is determined and evidenced well-by-well, is documented in the PDD, and is subject to VVB ...
This methodology applies only where all applicability conditions in Section 4.1 are satisfied. Each condition is determined and evidenced well-by-well, is documented in the PDD, and is subject to VVB review.
|
| Execution |
P&A is carried out using regulator-approved techniques and meets the cross-jurisdictional minimum criteria at Section 15.1. Final P&A report and certification by the competent regulatory authority....
P&A is carried out using regulator-approved techniques and meets the cross-jurisdictional minimum criteria at Section 15.1. Final P&A report and certification by the competent regulatory authority.
|
| Monitoring |
Plug integrity and surface condition: Annual, and after any adverse event. Visual inspection for surface disturbance, subsidence, venting, and wellhead or cap condition....
Plug integrity and surface condition: Annual, and after any adverse event. Visual inspection for surface disturbance, subsidence, venting, and wellhead or cap condition.
|
| Verification |
Joint validation and first periodic verification by an accredited VVB, conducted against criteria that expressly included ISO 14064-2:2019 and assessed under ISO 14064-3:2019....
Joint validation and first periodic verification by an accredited VVB, conducted against criteria that expressly included ISO 14064-2:2019 and assessed under ISO 14064-3:2019.
|
| Reporting |
The PDD contains: Purpose and objectives, Project activities, Technology applied, Location and project wells, Roles and responsibilities, Timing, Conditions prior to implementation, SSRs, Baseline, Ad...
The PDD contains: Purpose and objectives, Project activities, Technology applied, Location and project wells, Roles and responsibilities, Timing, Conditions prior to implementation, SSRs, Baseline, Additionality, Quantification, Monitoring plan, Data quality, Permanence and risk.
|
| Address1, Address 2, City/Region, State, Zip/Postal Code, Country |
Tulsa and Pawnee regions, United States, OK, Sand Springs, 74063...
Tulsa and Pawnee regions, United States, OK, Sand Springs, 74063
|
| Longitude - Site Location In Longitude Degrees |
-96.1879922398...
-96.1879922398
|
| Latitude - Site Location In Latitude Degrees |
36.1322055909...
36.1322055909
|
| TimeZone - Refers To The Time Zone In Reference To The GMT Standard |
America/Chicago...
America/Chicago
|
| OwnerID / Bank Customer ID |
5DBD1E348B9F94EC305FCE5A729190D5...
5DBD1E348B9F94EC305FCE5A729190D5
|
| OwnerName / Bank Customer name |
Terra Nova International, LLC...
Terra Nova International, LLC
|
| Parameter Value Under The Water Boiling Test (WBT) Method - 44% |
N/A...
N/A
|
| End Date |
N/A...
N/A
|
| Protocol Validator |
N/A...
N/A
|
| Validator ID |
N/A...
N/A
|
| Project Developer |
N/A...
N/A
|
| Project Developer ID |
N/A...
N/A
|
| Asset Name (If It Is A Different That Project Name) |
N/A...
N/A
|
| Project Status |
In-progress...
In-progress
|
| Ratings ID |
N/A...
N/A
|
| Ratings Score |
N/A...
N/A
|
| Ratings Report | N/A |
| Auditor/Verifier Attestations |
N/A...
N/A
|
| Auditor/Verifier ID |
06894B06A8B83F06CC2CB01C9E994557...
06894B06A8B83F06CC2CB01C9E994557
|
| ISO Certified |
Yes...
Yes
|
| ICROA Certified |
N/A...
N/A
|
| Project Monitoring |
Yes...
Yes
|
| Project Monitor Name |
Blackstone Petroleum...
Blackstone Petroleum
|
| Project Monitor Process Name |
N/A...
N/A
|
| Project Monitoring Process ID |
N/A...
N/A
|
| Project Monitoring Process & Methodology |
Methane emission rates are measured at each well prior to abandonment (Qpp) and following completion of P&A activities (Qpost) using calibrated methane analyzers....
Methane emission rates are measured at each well prior to abandonment (Qpp) and following completion of P&A activities (Qpost) using calibrated methane analyzers.
|
| Monitoring Frequency |
Interval...
Interval
|
| Insurance Provider Name |
We2Sure...
We2Sure
|
| Insurance ID |
CBDB59ABD3EB24B29122B14F545D54ED...
CBDB59ABD3EB24B29122B14F545D54ED
|
| Insurance Coverage Type |
N/A...
N/A
|
| Insurance Coverage Description |
N/A...
N/A
|
| Project # |
#490...
#490
|